Search Results
Use the filters on the left-hand side of this screen to refine the results further by topic or document type.

89 FR 40477

DOE announced the availability of the preliminary list of potential national interest electric transmission corridors, the designation of which would focus public and policymaker attention on the areas of greatest transmission need and unlock valuable federal financing and permitting tools to advance transmission development.

89 FR 40198

EPA finalized a CWA regulation to revise the technology-based effluent limitations guidelines and standards for the steam electric power generating point source category applicable to flue gas desulfurization wastewater, bottom ash transport water and legacy wastewater at existing sources, and combustion residual leachate at new and existing sources. 

89 FR 39124

EPA designated two per- and polyfluoroalkyl substances (PFAS)perfluorooctanoic acid (PFOA) and perfluorooctanesulfonic acid (PFOS), including their salts and structural isomersas hazardous substances under CERCLA. 

89 FR 38950

EPA established requirements for legacy coal combustion residuals (CCR) surface impoundments, as well as CCR management units at active CCR facilities and at inactive CCR facilities with a legacy CCR surface impoundment. 

89 FR 36681

EPA withdrew from Agency regulation and management two designated ocean dredged material disposal sites, the Nome East and Nome West Sites, located near Nome, Alaska, pursuant to the Marine Protection, Research, and Sanctuaries Act.

89 FR 36832

United States v. French Limited, Inc., No. 4:89-cv-2544 (S.D. Tex. Apr. 26, 2024). A fourth modification to a 1990 consent decree under CERCLA concerning contamination at the French Limited Superfund Site near Crosby, Texas, revises work requirements, provides for the reimbursement to EPA of certain response costs, and provides for the disbursement to members of the working group of funds received by EPA in a bankruptcy settlement payment for the site.

89 FR 36833

United States v. Sunoco Pipeline, L.P., No. 1:24-cv-00238-SJD (S.D. Ohio Apr. 29, 2024). Under a proposed consent decree, a settling CWA defendant must pay a civil penalty of $550,000 in addition to $1,250,000 to compensate for harm to natural resources in connection with crude oil escaping from a ruptured pipeline, contaminating waters of the United States, and causing damage to natural resources.

89 FR 35312

DOE amended its regulations for the timely coordination of federal authorizations for proposed interstate electric transmission facilities pursuant to the Federal Power Act.

89 FR 35861

United States v. Dow Silicones Corp., No. 19-11880 (E.D. Mich. Apr. 24, 2024). A proposed consent decree modification extends a deadline for a settling CWA defendant’s implementation of a stormwater capacity and pollutant evaluation from January 24, 2023, to January 24, 2026, and also includes requirements to mitigate any environmental harm associated with the extension of the deadline.