Search Results
Use the filters on the left-hand side of this screen to refine the results further by topic or document type.

89 FR 42451

NOAA and EPA seek comment on the agencies’ proposed finding that Alabama has satisfied each of the conditions the agencies included as part of their 1998 approval of Alabama’s coastal nonpoint pollution control program. 

89 FR 42602

DOI finalized regulatory amendments to its renewable energy regulations that eliminate unnecessary requirements for the deployment of meteorological buoys, increase survey flexibility, improve the project design and installation verification process, establish a public renewable energy leasing schedule, reform the Bureau of Ocean Energy Management's renewable energy auction regulations, tailor financial assurance requirements and instruments, and clarify safety management system regulations.

89 FR 41917

NMFS proposed to issue protective regulations under §4(d) of the ESA for the conservation of the threatened oceanic whitetip shark. 

89 FR 41946

NOAA approved a boundary expansion for the Narragansett Bay National Estuarine Research Reserve in Prudence Island, Rhode Island, under the CZMA.

89 FR 41392

NOAA approved a boundary expansion for the South Slough National Estuarine Research Reserve in Charleston, Oregon. 

89 FR 40198

EPA finalized a CWA regulation to revise the technology-based effluent limitations guidelines and standards for the steam electric power generating point source category applicable to flue gas desulfurization wastewater, bottom ash transport water and legacy wastewater at existing sources, and combustion residual leachate at new and existing sources. 

89 FR 38873

NMFS announced the initiation of a five-year review for the non-U.S. distinct population segment of smalltooth sawfish under the ESA. 

89 FR 36681

EPA withdrew from Agency regulation and management two designated ocean dredged material disposal sites, the Nome East and Nome West Sites, located near Nome, Alaska, pursuant to the Marine Protection, Research, and Sanctuaries Act.

89 FR 36982

FWS established a nonessential experimental population of the grizzly bear within the U.S. portion of the North Cascades Ecosystem (NCE) in the state of Washington under §10(j) of the ESA in order to support the reintroduction, recovery, and conservation of the species within the NCE. 

89 FR 36833

United States v. Sunoco Pipeline, L.P., No. 1:24-cv-00238-SJD (S.D. Ohio Apr. 29, 2024). Under a proposed consent decree, a settling CWA defendant must pay a civil penalty of $550,000 in addition to $1,250,000 to compensate for harm to natural resources in connection with crude oil escaping from a ruptured pipeline, contaminating waters of the United States, and causing damage to natural resources.