Search Results
Use the filters on the left-hand side of this screen to refine the results further by topic or document type.

89 FR 40198

EPA finalized a CWA regulation to revise the technology-based effluent limitations guidelines and standards for the steam electric power generating point source category applicable to flue gas desulfurization wastewater, bottom ash transport water and legacy wastewater at existing sources, and combustion residual leachate at new and existing sources. 

89 FR 36833

United States v. Sunoco Pipeline, L.P., No. 1:24-cv-00238-SJD (S.D. Ohio Apr. 29, 2024). Under a proposed consent decree, a settling CWA defendant must pay a civil penalty of $550,000 in addition to $1,250,000 to compensate for harm to natural resources in connection with crude oil escaping from a ruptured pipeline, contaminating waters of the United States, and causing damage to natural resources.

89 FR 35312

DOE amended its regulations for the timely coordination of federal authorizations for proposed interstate electric transmission facilities pursuant to the Federal Power Act.